A construction-ready ADA sidewalk package delivered inside a federal funding window
Client
Town of Summerville
Municipal Government

ADA-compliant sidewalk engineering, permitting documentation, and regulatory coordination produced a complete, construction-ready package for the Boone Street pedestrian corridor - a federally funded infrastructure improvement project - within the delivery window.
A federally funded infrastructure improvement project needed a fully compliant pedestrian corridor design and permitting package before construction could begin, on a fixed delivery timeline.
Smart Fusion delivered ADA-compliant sidewalk engineering, permitting documentation, and regulatory coordination for the Boone Street improvement corridor, producing construction-ready plans aligned to federal funding requirements.
- Complete construction-ready engineering package delivered on schedule
- Full ADA compliance across the Boone Street corridor
- Regulatory coordination and permitting handled end-to-end
- Federal funding requirements met without delay to the project timeline