A construction-ready ADA sidewalk package delivered inside a federal funding window

Town of Summerville

A construction-ready ADA sidewalk package delivered inside a federal funding window

ADA-compliant sidewalk engineering, permitting documentation, and regulatory coordination produced a complete, construction-ready package for the Boone Street pedestrian corridor - a federally funded infrastructure improvement project - within the delivery window.

Challenge

A federally funded infrastructure improvement project needed a fully compliant pedestrian corridor design and permitting package before construction could begin, on a fixed delivery timeline.

Solution

Smart Fusion delivered ADA-compliant sidewalk engineering, permitting documentation, and regulatory coordination for the Boone Street improvement corridor, producing construction-ready plans aligned to federal funding requirements.

Outcomes

  • Complete construction-ready engineering package delivered on schedule
  • Full ADA compliance across the Boone Street corridor
  • Regulatory coordination and permitting handled end-to-end
  • Federal funding requirements met without delay to the project timeline